STAR Public
  • Space Technologies and Rocketry
  • Quick Links
  • Member Info
    • Membership Requirements
    • Elections
  • Current Projects
    • ALULA: First Leap
      • Project Objectives
      • High-Level System Parameters
      • Propulsion
      • Avionics
      • Airframe
      • Recovery
    • Caldera: IREC 2024
      • Airframe
      • Avionics
      • Airbrakes
      • Recovery
      • Staging
      • KELSE-Y (Payload)
  • Previous Projects
    • CalVistor: IREC 2023
      • Recovery (CalVistor)
      • Airframe (CalVistor)
      • Airbrakes (CalVistor)
      • Payload (CalVistor)
    • ELLIE
      • ELLIE Overview
      • Timeline
      • Physical System
      • Electrical and Software
      • Ongoing Research
    • MINDI
      • Airframe
      • Recovery
    • PinkBeary
      • Altimeter Wiring Update
      • Airframe Diameter
      • Fin Sizing
      • Pyro Bolts
      • Electronics
    • CAS
      • CAS Overview
      • Core Module
      • Radio Module
      • Pyro Module
      • Prop Module
      • CAS Core Revised
      • CAS Radio Revised
    • DAVE
      • Summary of DAVE
      • FAQ's
      • DAVE Blog
    • Bear Force One: IREC 2020/2021
      • Airframe
      • Recovery
        • Parachute Harness
        • Avionics Bay
          • Avionics Bay Glossary
          • Avionics Bay Assembly
        • Black Powder Holders
        • Payload
          • Payload Subsystem Report
          • IRIS
            • Peripherals Diagram
            • Pinout Diagram
            • Power Flow Diagram
          • MFC (2020)
          • Stabilization
          • Structures
          • Cameras
          • Muons - Archived
          • IRIS Legacy - Archived
    • Arctos
    • AirBears
  • Frequently Asked Questions
  • Tutorials
    • Media
      • How to make a decent video
    • RFS Safety Training
    • Submitting Reimbursements
    • Software Setup
      • SolidWorks Installation
      • VMware/Boot Camp setup
      • [In-Progress] SolidWorks PDM Setup
      • ANSYS Installation and Setup
      • Solidworks Assemblies Basics
      • OpenRocket Installation
      • Deprecated Software
        • [deprecated] Getting Started With GrabCAD Workbench
        • [deprecated] Using GrabCAD Workbench in SolidWorks
        • [deprecated] Connecting to CalSTAR's Server
        • [deprecated] Installing and Licensing Converge CFD
    • General Tutorials
      • How to Use SolidWorks Templates
      • [In Progress] Digikey Ordering Guide
      • SolidWorks Training Session
      • SolidWorks Training Tutorials
    • Enery Systems
    • Manufacturing
      • Material Properties and Uses
      • 3D Printing (FDM)
      • Laser Cutting
      • FabLight: Metal Laser Cutter
      • Milling
        • Othermill
        • [Empty] Manual Mills
      • Tolerancing
      • Fasteners
      • Suppliers
      • Composite Materials and Best Practices
      • 8020 Extrusions
    • Airframe
      • Airframe Components
      • Tube Attachement
      • OpenRocket
      • Tube Winding
      • Sizing Fins
      • Attaching Fins
      • Rail Buttons
      • Motor Retention
      • Painting Rockets
    • Avionics
      • KiCad
      • Git
      • Project Management
      • Firmware Development Environment
      • Ground Station Software
      • Intro to Embedded C Programming
      • Schematic and Layout Review
      • Board Design Reference
      • Using Lab Equipment
      • Reflow Oven
      • Soldering
      • Debugging Tips/Testing
      • Ham Radio Basics
      • Component Selection
      • High Temperature Batteries
    • Outreach Activities
      • Straw Rocketry
      • Spacecraft Structures
      • Alka Seltzer Rockets
      • Paper Airplane Launcher
      • Coding Workshop
    • Operations
      • SolidWorks file conventions
      • Style Guidelines
      • LaTeX
    • Payload
    • Propulsion
      • Feed System Types
      • Rocket Propulsion Analysis Tutorial
      • Ignition Devices
      • Creating a Piping and Instrumentation Diagram P&ID
      • Pipes, Fittings, and Components
      • Injectors
    • Recovery
      • Parachute Sizing
      • Avionics Sled
      • [in progress] Altimeters
      • Wire Design and Routing
    • Simulations
      • FEA Simulation Tutorial using ANSYS
      • Getting Started with CONVERGE (2.4)
      • [Empty] Simulation Methods
      • Mathematical Models
      • SimScale
        • SimScale 3D CFD
      • Using ANSYS
      • ANSYS 19.2 2D CFD Tutorial
      • ANSYS 19.2 3D CFD Tutorial
    • Administrative
      • Azure Server
    • Page 1
  • Reference
    • Reference
    • Glossaries
      • Propulsion
      • Common Acronyms and Definitions
    • Brand Guidelines
    • Legal
    • High Power Rocketry (HPR)
      • NASA HPR Reference
      • L1 and L2 Certification Tips & Tricks
      • HPR Kits
      • HPR Design
      • HPR Suppliers
      • STAR HPR Certification
    • Ham Operators
    • X-Winder Update Log
    • Safety
      • Materials
      • Tools
      • Electrical
      • Range Safety
  • Testing
    • Test Forms
    • Damage Report Forms
    • Airframe Tests
    • Recovery Tests
      • Ground Ejection Test
  • Onboarding
    • Intro Projects
      • Airframe
      • Avionics
        • PCB Design Mini-Project
      • Operations
      • Payload
      • Propulsion
      • Outreach
      • Recovery
      • Media
      • Safety
      • Simulations
      • Old Intro Projects
        • Payload 2020 Intro Project
        • Propulsion Fall 2019
        • Avionics 2018
        • Recovery 2018
        • Avionics (new intro project Fall 2021)
  • Project Management
  • History of the Team
    • Early Years
    • Executive History
    • Launch History
      • 2022-12-03 MINDI First Flight
      • 2022-09-17 Pinkbeary First Flight
      • 2019-11-16 AirBears First Flight
      • 2018-03-24 Final flight for Arktos
      • 2017-04-08 Competition Launch, NASA SL 2017
      • 2017-03-25 FRR Re-Re-Flight, NASA SL 2017
      • 2017-03-12 FRR Re-Flight, NASA SL 2017
      • 2017-03-04 FRR Flight, NASA SL 2017
      • 2016-12-04 CDR Subscale Flight, NASA SL 2017
    • Fleet
  • How to use GitBook
Powered by GitBook
On this page
  • Procedure
  • Prep work
  • Aluminum Bulkhead Manufacturing
  • Assemble the AvBay for Test Fit
  • Assembly of AvBay within the Tube
Export as PDF
  1. Previous Projects
  2. Bear Force One: IREC 2020/2021
  3. Recovery
  4. Avionics Bay

Avionics Bay Assembly

a step by step breakdown of assembling and manufacturing the avionics bay, as well as key design decisions that were made.

  • Sand Paper

  • Filers

  • Phillips screw driver

  • Drill and drill bits

  • Respirators (when filing fiberglass)

  • Epoxy (JB Weld ColdWeld ™️ Steel Reinforced Epoxy)

  • bulkhead jig (designed to correctly place bulkhead and keep level

Procedure

Unfortunately for this assembly/manufacturing process to epoxy the avionics bay into the airframe became more inconvenient due to the need to epoxy the door nuts to the airframe. As a result, we must assemble the av bay in the airframe tube layer by layer. The components once within the av bay will no longer be accessible, apart from the sled and electronics mounted on it.

Prep work

Aluminum Bulkhead Manufacturing

Assemble the AvBay for Test Fit

This is done so that we can be assured of the fit of all components before we assemble the av bay within the tube

Assembly of AvBay within the Tube

Note that this is especially difficult and limited for BFO specifically because of the accessibility and mounting requirements of the av bay

1. Epoxy in the first bulkhead

PreviousAvionics Bay GlossaryNextBlack Powder Holders

Last updated 1 year ago

Begin epoxying procedure using JB Weld:

https://docs.google.com/document/d/1DCgi2xNbCKLSVA-2AojZUtkCFQReliQGcxFavwJx-4g/edit