STAR Public
  • Space Technologies and Rocketry
  • Quick Links
  • Member Info
    • Membership Requirements
    • Elections
  • Current Projects
    • ALULA: First Leap
      • Project Objectives
      • High-Level System Parameters
      • Propulsion
      • Avionics
      • Airframe
      • Recovery
    • Caldera: IREC 2024
      • Airframe
      • Avionics
      • Airbrakes
      • Recovery
      • Staging
      • KELSE-Y (Payload)
  • Previous Projects
    • CalVistor: IREC 2023
      • Recovery (CalVistor)
      • Airframe (CalVistor)
      • Airbrakes (CalVistor)
      • Payload (CalVistor)
    • ELLIE
      • ELLIE Overview
      • Timeline
      • Physical System
      • Electrical and Software
      • Ongoing Research
    • MINDI
      • Airframe
      • Recovery
    • PinkBeary
      • Altimeter Wiring Update
      • Airframe Diameter
      • Fin Sizing
      • Pyro Bolts
      • Electronics
    • CAS
      • CAS Overview
      • Core Module
      • Radio Module
      • Pyro Module
      • Prop Module
      • CAS Core Revised
      • CAS Radio Revised
    • DAVE
      • Summary of DAVE
      • FAQ's
      • DAVE Blog
    • Bear Force One: IREC 2020/2021
      • Airframe
      • Recovery
        • Parachute Harness
        • Avionics Bay
          • Avionics Bay Glossary
          • Avionics Bay Assembly
        • Black Powder Holders
        • Payload
          • Payload Subsystem Report
          • IRIS
            • Peripherals Diagram
            • Pinout Diagram
            • Power Flow Diagram
          • MFC (2020)
          • Stabilization
          • Structures
          • Cameras
          • Muons - Archived
          • IRIS Legacy - Archived
    • Arctos
    • AirBears
  • Frequently Asked Questions
  • Tutorials
    • Media
      • How to make a decent video
    • RFS Safety Training
    • Submitting Reimbursements
    • Software Setup
      • SolidWorks Installation
      • VMware/Boot Camp setup
      • [In-Progress] SolidWorks PDM Setup
      • ANSYS Installation and Setup
      • Solidworks Assemblies Basics
      • OpenRocket Installation
      • Deprecated Software
        • [deprecated] Getting Started With GrabCAD Workbench
        • [deprecated] Using GrabCAD Workbench in SolidWorks
        • [deprecated] Connecting to CalSTAR's Server
        • [deprecated] Installing and Licensing Converge CFD
    • General Tutorials
      • How to Use SolidWorks Templates
      • [In Progress] Digikey Ordering Guide
      • SolidWorks Training Session
      • SolidWorks Training Tutorials
    • Enery Systems
    • Manufacturing
      • Material Properties and Uses
      • 3D Printing (FDM)
      • Laser Cutting
      • FabLight: Metal Laser Cutter
      • Milling
        • Othermill
        • [Empty] Manual Mills
      • Tolerancing
      • Fasteners
      • Suppliers
      • Composite Materials and Best Practices
      • 8020 Extrusions
    • Airframe
      • Airframe Components
      • Tube Attachement
      • OpenRocket
      • Tube Winding
      • Sizing Fins
      • Attaching Fins
      • Rail Buttons
      • Motor Retention
      • Painting Rockets
    • Avionics
      • KiCad
      • Git
      • Project Management
      • Firmware Development Environment
      • Ground Station Software
      • Intro to Embedded C Programming
      • Schematic and Layout Review
      • Board Design Reference
      • Using Lab Equipment
      • Reflow Oven
      • Soldering
      • Debugging Tips/Testing
      • Ham Radio Basics
      • Component Selection
      • High Temperature Batteries
    • Outreach Activities
      • Straw Rocketry
      • Spacecraft Structures
      • Alka Seltzer Rockets
      • Paper Airplane Launcher
      • Coding Workshop
    • Operations
      • SolidWorks file conventions
      • Style Guidelines
      • LaTeX
    • Payload
    • Propulsion
      • Feed System Types
      • Rocket Propulsion Analysis Tutorial
      • Ignition Devices
      • Creating a Piping and Instrumentation Diagram P&ID
      • Pipes, Fittings, and Components
      • Injectors
    • Recovery
      • Parachute Sizing
      • Avionics Sled
      • [in progress] Altimeters
      • Wire Design and Routing
    • Simulations
      • FEA Simulation Tutorial using ANSYS
      • Getting Started with CONVERGE (2.4)
      • [Empty] Simulation Methods
      • Mathematical Models
      • SimScale
        • SimScale 3D CFD
      • Using ANSYS
      • ANSYS 19.2 2D CFD Tutorial
      • ANSYS 19.2 3D CFD Tutorial
    • Administrative
      • Azure Server
    • Page 1
  • Reference
    • Reference
    • Glossaries
      • Propulsion
      • Common Acronyms and Definitions
    • Brand Guidelines
    • Legal
    • High Power Rocketry (HPR)
      • NASA HPR Reference
      • L1 and L2 Certification Tips & Tricks
      • HPR Kits
      • HPR Design
      • HPR Suppliers
      • STAR HPR Certification
    • Ham Operators
    • X-Winder Update Log
    • Safety
      • Materials
      • Tools
      • Electrical
      • Range Safety
  • Testing
    • Test Forms
    • Damage Report Forms
    • Airframe Tests
    • Recovery Tests
      • Ground Ejection Test
  • Onboarding
    • Intro Projects
      • Airframe
      • Avionics
        • PCB Design Mini-Project
      • Operations
      • Payload
      • Propulsion
      • Outreach
      • Recovery
      • Media
      • Safety
      • Simulations
      • Old Intro Projects
        • Payload 2020 Intro Project
        • Propulsion Fall 2019
        • Avionics 2018
        • Recovery 2018
        • Avionics (new intro project Fall 2021)
  • Project Management
  • History of the Team
    • Early Years
    • Executive History
    • Launch History
      • 2022-12-03 MINDI First Flight
      • 2022-09-17 Pinkbeary First Flight
      • 2019-11-16 AirBears First Flight
      • 2018-03-24 Final flight for Arktos
      • 2017-04-08 Competition Launch, NASA SL 2017
      • 2017-03-25 FRR Re-Re-Flight, NASA SL 2017
      • 2017-03-12 FRR Re-Flight, NASA SL 2017
      • 2017-03-04 FRR Flight, NASA SL 2017
      • 2016-12-04 CDR Subscale Flight, NASA SL 2017
    • Fleet
  • How to use GitBook
Powered by GitBook
On this page
  • Reasoning for Update
  • New solution
  • Schematic
Export as PDF
  1. Previous Projects
  2. PinkBeary

Altimeter Wiring Update

New altimeter wiring will involve short lengths of wire soldered directly into the altimeter at one end and into a crimp connection at the other.

PreviousPinkBearyNextAirframe Diameter

Last updated 1 year ago

Reasoning for Update

One of the recovery subteam’s slowest steps at launch is connecting wires to the altimeters. The spaces that the wires must be fit into are very small, making it difficult to maneuver and secure them. This can lead to delays because connecting the wires is time-consuming and insecure connections can lead to ground test failure. It also cannot be fully-completed ahead of time as the altimeters must be re-wired between ground test and launch.

Previous solutions have involved positioning the altimeters on the sled such that the connections are easier to access and using crimps to speed up the connection process. However, even with good altimeter placement, it can be difficult to position the wires. Recovery also had issues in creating secure connections to the crimps and did not consider them reliable enough for launch.

New solution

Recovery plans to solder short lengths of wire directly into the altimeters at one end and into a crimp at the other. The end with the crimp could then be easily connected to a longer wire for ground test or flight, saving time at launch. Soldering into the crimp should increase the security of the connection, preventing the previous problems associated with crimps.

This solution allows recovery to change the wiring of the altimeters, despite soldering a wire permanently into the altimeter because the long wire going to the other connection point is replaceable. Solutions involving solder were previously not considered because of the requirement of reconfiguring wires at launch.

Schematic

Schematic of wire connections to altimeters