STAR Public
  • Space Technologies and Rocketry
  • Quick Links
  • Member Info
    • Membership Requirements
    • Elections
  • Current Projects
    • ALULA: First Leap
      • Project Objectives
      • High-Level System Parameters
      • Propulsion
      • Avionics
      • Airframe
      • Recovery
    • Caldera: IREC 2024
      • Airframe
      • Avionics
      • Airbrakes
      • Recovery
      • Staging
      • KELSE-Y (Payload)
  • Previous Projects
    • CalVistor: IREC 2023
      • Recovery (CalVistor)
      • Airframe (CalVistor)
      • Airbrakes (CalVistor)
      • Payload (CalVistor)
    • ELLIE
      • ELLIE Overview
      • Timeline
      • Physical System
      • Electrical and Software
      • Ongoing Research
    • MINDI
      • Airframe
      • Recovery
    • PinkBeary
      • Altimeter Wiring Update
      • Airframe Diameter
      • Fin Sizing
      • Pyro Bolts
      • Electronics
    • CAS
      • CAS Overview
      • Core Module
      • Radio Module
      • Pyro Module
      • Prop Module
      • CAS Core Revised
      • CAS Radio Revised
    • DAVE
      • Summary of DAVE
      • FAQ's
      • DAVE Blog
    • Bear Force One: IREC 2020/2021
      • Airframe
      • Recovery
        • Parachute Harness
        • Avionics Bay
          • Avionics Bay Glossary
          • Avionics Bay Assembly
        • Black Powder Holders
        • Payload
          • Payload Subsystem Report
          • IRIS
            • Peripherals Diagram
            • Pinout Diagram
            • Power Flow Diagram
          • MFC (2020)
          • Stabilization
          • Structures
          • Cameras
          • Muons - Archived
          • IRIS Legacy - Archived
    • Arctos
    • AirBears
  • Frequently Asked Questions
  • Tutorials
    • Media
      • How to make a decent video
    • RFS Safety Training
    • Submitting Reimbursements
    • Software Setup
      • SolidWorks Installation
      • VMware/Boot Camp setup
      • [In-Progress] SolidWorks PDM Setup
      • ANSYS Installation and Setup
      • Solidworks Assemblies Basics
      • OpenRocket Installation
      • Deprecated Software
        • [deprecated] Getting Started With GrabCAD Workbench
        • [deprecated] Using GrabCAD Workbench in SolidWorks
        • [deprecated] Connecting to CalSTAR's Server
        • [deprecated] Installing and Licensing Converge CFD
    • General Tutorials
      • How to Use SolidWorks Templates
      • [In Progress] Digikey Ordering Guide
      • SolidWorks Training Session
      • SolidWorks Training Tutorials
    • Enery Systems
    • Manufacturing
      • Material Properties and Uses
      • 3D Printing (FDM)
      • Laser Cutting
      • FabLight: Metal Laser Cutter
      • Milling
        • Othermill
        • [Empty] Manual Mills
      • Tolerancing
      • Fasteners
      • Suppliers
      • Composite Materials and Best Practices
      • 8020 Extrusions
    • Airframe
      • Airframe Components
      • Tube Attachement
      • OpenRocket
      • Tube Winding
      • Sizing Fins
      • Attaching Fins
      • Rail Buttons
      • Motor Retention
      • Painting Rockets
    • Avionics
      • KiCad
      • Git
      • Project Management
      • Firmware Development Environment
      • Ground Station Software
      • Intro to Embedded C Programming
      • Schematic and Layout Review
      • Board Design Reference
      • Using Lab Equipment
      • Reflow Oven
      • Soldering
      • Debugging Tips/Testing
      • Ham Radio Basics
      • Component Selection
      • High Temperature Batteries
    • Outreach Activities
      • Straw Rocketry
      • Spacecraft Structures
      • Alka Seltzer Rockets
      • Paper Airplane Launcher
      • Coding Workshop
    • Operations
      • SolidWorks file conventions
      • Style Guidelines
      • LaTeX
    • Payload
    • Propulsion
      • Feed System Types
      • Rocket Propulsion Analysis Tutorial
      • Ignition Devices
      • Creating a Piping and Instrumentation Diagram P&ID
      • Pipes, Fittings, and Components
      • Injectors
    • Recovery
      • Parachute Sizing
      • Avionics Sled
      • [in progress] Altimeters
      • Wire Design and Routing
    • Simulations
      • FEA Simulation Tutorial using ANSYS
      • Getting Started with CONVERGE (2.4)
      • [Empty] Simulation Methods
      • Mathematical Models
      • SimScale
        • SimScale 3D CFD
      • Using ANSYS
      • ANSYS 19.2 2D CFD Tutorial
      • ANSYS 19.2 3D CFD Tutorial
    • Administrative
      • Azure Server
    • Page 1
  • Reference
    • Reference
    • Glossaries
      • Propulsion
      • Common Acronyms and Definitions
    • Brand Guidelines
    • Legal
    • High Power Rocketry (HPR)
      • NASA HPR Reference
      • L1 and L2 Certification Tips & Tricks
      • HPR Kits
      • HPR Design
      • HPR Suppliers
      • STAR HPR Certification
    • Ham Operators
    • X-Winder Update Log
    • Safety
      • Materials
      • Tools
      • Electrical
      • Range Safety
  • Testing
    • Test Forms
    • Damage Report Forms
    • Airframe Tests
    • Recovery Tests
      • Ground Ejection Test
  • Onboarding
    • Intro Projects
      • Airframe
      • Avionics
        • PCB Design Mini-Project
      • Operations
      • Payload
      • Propulsion
      • Outreach
      • Recovery
      • Media
      • Safety
      • Simulations
      • Old Intro Projects
        • Payload 2020 Intro Project
        • Propulsion Fall 2019
        • Avionics 2018
        • Recovery 2018
        • Avionics (new intro project Fall 2021)
  • Project Management
  • History of the Team
    • Early Years
    • Executive History
    • Launch History
      • 2022-12-03 MINDI First Flight
      • 2022-09-17 Pinkbeary First Flight
      • 2019-11-16 AirBears First Flight
      • 2018-03-24 Final flight for Arktos
      • 2017-04-08 Competition Launch, NASA SL 2017
      • 2017-03-25 FRR Re-Re-Flight, NASA SL 2017
      • 2017-03-12 FRR Re-Flight, NASA SL 2017
      • 2017-03-04 FRR Flight, NASA SL 2017
      • 2016-12-04 CDR Subscale Flight, NASA SL 2017
    • Fleet
  • How to use GitBook
Powered by GitBook
On this page
  • Introduction
  • New Member Project (8 hrs)
  • Task 1 | Knot Tying (0.5 hrs)
  • Task 2 | Recovery Sequence (0.5 hrs)
  • Task 3 | Parachute Selection (3 hrs)
  • Task 4 | Bulkhead Design (4 hrs)
  • Task 5 | Creative Section (X hrs)
  • Returning Member Project (10.5 hrs)
  • Task 0 | Intro Project (7.5 hrs)
  • Task 6 | Wiring Diagram (1 hr)
  • Task 7 | Launch Day Checklist Quiz (0.5 hrs)
  • Task 8 | Technical Writing (1.5 hr)
Export as PDF
  1. Onboarding
  2. Intro Projects
  3. Old Intro Projects

Recovery 2018

Welcome to the recovery team. We want you.

PreviousAvionics 2018NextAvionics (new intro project Fall 2021)

Last updated 6 years ago

Introduction

Welcome to the Recovery team's intro/returning project page! Glad you're here.

The recovery team is tasked with safely landing the launch vehicle. This responsibility entails understanding the constraints provided by others/the specifications of the launch vehicle itself and producing creative and efficient solutions. Tasks include but are not limited to: parachute size/material/geometry selection, parachute deployment altitude selection, ejection/separation mechanisms, and a general understanding of mechanics, electronics, simulations, physics, and more.

For any questions/help, feel free to reach out to the recovery team lead, Allen, and deputy, Evan at office hours or online through Discord/email. Office Hour times/locations for both are listed below. OH are highly encouraged if you need help!

  • Allen Ruan | Recovery Team Lead

    • OH: Thurs 3-5PM, Kresge Engineering Library or Etcheverry CAD Lab(check discord for exact location)

    • Email:

  • Evan Borzilleri | Recovery Team Deputy

    • OH: Monday 10AM-12PM, Kresge Engineering Library (check discord for exact location)

    • Email:

[Workshop] = indicates that a workshop will be provided for the fundamentals of this task. Workshops are mandatory, and will make accomplishing the tasks much more simple. Workshop times are listed below:

  • [OpenRocket] | [When] [Where]

  • [PDM] | [When] [Where]

  • [Recovery] | Thursday 6-7PM (09/13) in Etcheverry 3rd Floor (check discord for room #)

  • [Solidworks] | Saturday 2-4PM (09/15) CAD Lab (Etcheverry 1171)

New Member Project (8 hrs)

The new member project for the recovery subteam is intended to:

  1. Introduce a strong technical foundation for the critical components of the recovery subsystem to new members

  2. Learn to work with constraints, similar to industry

  3. Encourage collaboration/asking for help to accomplish these tasks

The deliverables of the project should be presented at the recovery subteam meeting (Sept. 27th) in the form of a .ppt slide deck containing snapshots of the various projects. Remember! This project is meant to be challenging, but attainable, especially if you ask for help. So please ask questions, come to workshops, and come to office hours!

Task 1 | Knot Tying (0.5 hrs)

Workshops | [Recovery]

Objective | Become familiar with and learn to tie all the knots necessary for parachute deployment systems (All knots will be demoed in the workshop). The following knots must be perfected:

  • Eight knot

  • Square knot

  • Bowline knot

  • Alpine Butterfly knot

  • Double hitch

Deliverable | The student must demonstrate tying all the knots above to either Evan or Allen

Task 2 | Recovery Sequence (0.5 hrs)

Workshops | [Recovery]

Objective | Create a flowchart detailing the sequence of recovery events starting from when the launch vehicle is at apogee to when it is fully recovered. Images/Drawings are encouraged.

Hint: There's at least around 4 events starting from apogee and ending with landing. The more detailed the events are described, the better.

Deliverable | Flowchart (can use draw.io or any other diagram sites)

Task 3 | Parachute Selection (3 hrs)

Workshops | [Recovery] [OpenRocket]

Objective | Select the best combination of parachutes that satisfies the constraints below:

Constraints:

  • Drogue is deployed at apogee (maximum altitude)

  • Main is deployed at 600ft above ground level (AGL)

  • Drogue Cd (Coefficient of Drag): 1.5

  • Main Cd: 2.2

  • Each component must not land with greater than 75 ftlb-f

  • Drift radius must be less than 2500ft in 20mph wind

Parachute Options

Drogue Deployment Velocity (ft/s)

Drogue Terminal Velocity (ft/s)

Main Deployment Velocity (ft/s)

Main Terminal Velocity (ft/s)

KE of Upper Section before Landing (ft-lbf)

KE of Avionics Bay before Landing (ft-lbf)

KE of Lower Section before Landing (ft-lbf)

Drift in 20mph wind (ft)

Option 1: Main - 72", Drogue - 12"

Option 2: Main - 72", Drogue - 24"

Option 3: Main - 60", Drogue - 24"

Hint: First calculate the masses of the upper, lower, and avionics bay sections using the given OpenRocket File for Arktos. In this case, the upper section is referring to all components above the avionics bay while lower section refers to all components below the avionics bay.

Deliverable | Modified table with filled out fields in .ppt and correct option with explanation of why this is the best option out of the three. .ppt must show work/calculations. Cheating is not tolerated.

BONUS: Play around with OpenRocket and select your own combination of sizes that would be even better than the best option listed above.

Task 4 | Bulkhead Design (4 hrs)

Workshops | [PDM] [Recovery] [Solidworks]

Objective | Create a CAD assembly of a rocket bulkhead using Solidworks. Once complete, check-in to CalSTAR’s Solidworks Workgroup PDM. The CAD Assembly shall consist of the following parts/components:

  • Outer Bulkhead

  • Inner Bulkhead

  • U-Bolt

    • 1/4" Bolt

    • 1/4" Flat Washers (x4)

    • 1/4" - 20 Nuts (x4)

Drawings of the necessary parts are provided below:

For bonus points:

  • Include material properties for each component

  • Etch text on both sides of the combined bulkhead

Deliverable | Snapshots of the full assembly (two different views), and screenshot of assembly uploaded to the PDM

Task 5 | Creative Section (X hrs)

Workshops | [Recovery] [Solidworks]

Objective | CAD and mockup a functional electronics sled for the avionics bay. The sled must meet the following requirements:

  • Designed in 3D modeling software (preferably Solidworks)

  • Must be able to mount Stratologger CF altimeters and 9V Duracell batteries

  • Fit within a 4in diameter tube

NOTE: This is meant to be an open-ended project; there is no "correct" way to complete it. We just want to see what new and innovative designs you can come up with. Manufacturing methods are also open-ended (some suggestions might include 3D printing, lasercutting, etc.).

Deliverable | Manufactured sled and its assembly file uploaded to the PDM. Add photos to the .ppt and describe the design

Returning Member Project (10.5 hrs)

Similar to the new member project, the returning member project is intended on refreshing everyone’s mind on performing the pertinent tasks for the recovery team, in addition to educating members on a deeper level focused on manufacturing and big-picture understanding. It is due on 09/20.

Task 0 | Intro Project (7.5 hrs)

Workshops | [OpenRocket] [PDM] [Recovery] [Solidworks]

Objective | Complete tasks 1, 3, and 4 the intro project

Deliverable | Document all work on a .ppt as outlined above

Task 6 | Wiring Diagram (1 hr)

Workshops | [Recovery]

Objective | Create a wiring diagram of all the electronics/wiring included in the avionics system for a dual deployment recovery system using a flowchart software (eg. draw.io). Include + and -. This might require looking into an altimeter datasheet (look up perfectflite stratologger CF). Components that shall be included:

  • 1 Altimeter

  • 1 9V Battery

  • 1 External Switch

  • 1 Main Charge

  • 1 Drogue Charge

Below is a snapshot of a diagram with the altimeter and batter to get you started.

Deliverable | Snapshot of wiring diagram in .ppt

Task 7 | Launch Day Checklist Quiz (0.5 hrs)

Workshops | None

Objective | Complete the following quiz about the sequence of events that we, as a recovery team, complete during a launch day. Unlimited attempts, but must get a perfect score.

Deliverable | Screenshot of perfect score

Task 8 | Technical Writing (1.5 hr)

Workshops | None

Objective | Given the importance of technical reports/documentation in what we do, write a paragraph detailing the specs and function of the bulkhead you have just created. Include an image of the CAD and the actual manufactured bulkhead. Include a reference for the figure and a caption. Format is up to you, but please check for typos and grammatical errors. If you have any questions, there exists a lot of good documentation on LaTeX online, and/or come to OH.

Deliverable | .pdf of the LaTeX document

Link:

allenruan@berkeley.edu
evanjborzilleri@berkeley.edu
https://goo.gl/forms/MhCX3EOcK8SDAHts1
3KB
SL Full Scale V6.ork
OpenRocket File for Arktos
56KB
Assembled Bulkhead.PDF
pdf
Assembled Bulkhead
51KB
Bulkhead 1.PDF
pdf
Bulkhead #1 Drawing
51KB
Bulkhead 2.PDF
pdf
Bulkhead #2 Drawing