STAR Public
  • Space Technologies and Rocketry
  • Quick Links
  • Member Info
    • Membership Requirements
    • Elections
  • Current Projects
    • ALULA: First Leap
      • Project Objectives
      • High-Level System Parameters
      • Propulsion
      • Avionics
      • Airframe
      • Recovery
    • Caldera: IREC 2024
      • Airframe
      • Avionics
      • Airbrakes
      • Recovery
      • Staging
      • KELSE-Y (Payload)
  • Previous Projects
    • CalVistor: IREC 2023
      • Recovery (CalVistor)
      • Airframe (CalVistor)
      • Airbrakes (CalVistor)
      • Payload (CalVistor)
    • ELLIE
      • ELLIE Overview
      • Timeline
      • Physical System
      • Electrical and Software
      • Ongoing Research
    • MINDI
      • Airframe
      • Recovery
    • PinkBeary
      • Altimeter Wiring Update
      • Airframe Diameter
      • Fin Sizing
      • Pyro Bolts
      • Electronics
    • CAS
      • CAS Overview
      • Core Module
      • Radio Module
      • Pyro Module
      • Prop Module
      • CAS Core Revised
      • CAS Radio Revised
    • DAVE
      • Summary of DAVE
      • FAQ's
      • DAVE Blog
    • Bear Force One: IREC 2020/2021
      • Airframe
      • Recovery
        • Parachute Harness
        • Avionics Bay
          • Avionics Bay Glossary
          • Avionics Bay Assembly
        • Black Powder Holders
        • Payload
          • Payload Subsystem Report
          • IRIS
            • Peripherals Diagram
            • Pinout Diagram
            • Power Flow Diagram
          • MFC (2020)
          • Stabilization
          • Structures
          • Cameras
          • Muons - Archived
          • IRIS Legacy - Archived
    • Arctos
    • AirBears
  • Frequently Asked Questions
  • Tutorials
    • Media
      • How to make a decent video
    • RFS Safety Training
    • Submitting Reimbursements
    • Software Setup
      • SolidWorks Installation
      • VMware/Boot Camp setup
      • [In-Progress] SolidWorks PDM Setup
      • ANSYS Installation and Setup
      • Solidworks Assemblies Basics
      • OpenRocket Installation
      • Deprecated Software
        • [deprecated] Getting Started With GrabCAD Workbench
        • [deprecated] Using GrabCAD Workbench in SolidWorks
        • [deprecated] Connecting to CalSTAR's Server
        • [deprecated] Installing and Licensing Converge CFD
    • General Tutorials
      • How to Use SolidWorks Templates
      • [In Progress] Digikey Ordering Guide
      • SolidWorks Training Session
      • SolidWorks Training Tutorials
    • Enery Systems
    • Manufacturing
      • Material Properties and Uses
      • 3D Printing (FDM)
      • Laser Cutting
      • FabLight: Metal Laser Cutter
      • Milling
        • Othermill
        • [Empty] Manual Mills
      • Tolerancing
      • Fasteners
      • Suppliers
      • Composite Materials and Best Practices
      • 8020 Extrusions
    • Airframe
      • Airframe Components
      • Tube Attachement
      • OpenRocket
      • Tube Winding
      • Sizing Fins
      • Attaching Fins
      • Rail Buttons
      • Motor Retention
      • Painting Rockets
    • Avionics
      • KiCad
      • Git
      • Project Management
      • Firmware Development Environment
      • Ground Station Software
      • Intro to Embedded C Programming
      • Schematic and Layout Review
      • Board Design Reference
      • Using Lab Equipment
      • Reflow Oven
      • Soldering
      • Debugging Tips/Testing
      • Ham Radio Basics
      • Component Selection
      • High Temperature Batteries
    • Outreach Activities
      • Straw Rocketry
      • Spacecraft Structures
      • Alka Seltzer Rockets
      • Paper Airplane Launcher
      • Coding Workshop
    • Operations
      • SolidWorks file conventions
      • Style Guidelines
      • LaTeX
    • Payload
    • Propulsion
      • Feed System Types
      • Rocket Propulsion Analysis Tutorial
      • Ignition Devices
      • Creating a Piping and Instrumentation Diagram P&ID
      • Pipes, Fittings, and Components
      • Injectors
    • Recovery
      • Parachute Sizing
      • Avionics Sled
      • [in progress] Altimeters
      • Wire Design and Routing
    • Simulations
      • FEA Simulation Tutorial using ANSYS
      • Getting Started with CONVERGE (2.4)
      • [Empty] Simulation Methods
      • Mathematical Models
      • SimScale
        • SimScale 3D CFD
      • Using ANSYS
      • ANSYS 19.2 2D CFD Tutorial
      • ANSYS 19.2 3D CFD Tutorial
    • Administrative
      • Azure Server
    • Page 1
  • Reference
    • Reference
    • Glossaries
      • Propulsion
      • Common Acronyms and Definitions
    • Brand Guidelines
    • Legal
    • High Power Rocketry (HPR)
      • NASA HPR Reference
      • L1 and L2 Certification Tips & Tricks
      • HPR Kits
      • HPR Design
      • HPR Suppliers
      • STAR HPR Certification
    • Ham Operators
    • X-Winder Update Log
    • Safety
      • Materials
      • Tools
      • Electrical
      • Range Safety
  • Testing
    • Test Forms
    • Damage Report Forms
    • Airframe Tests
    • Recovery Tests
      • Ground Ejection Test
  • Onboarding
    • Intro Projects
      • Airframe
      • Avionics
        • PCB Design Mini-Project
      • Operations
      • Payload
      • Propulsion
      • Outreach
      • Recovery
      • Media
      • Safety
      • Simulations
      • Old Intro Projects
        • Payload 2020 Intro Project
        • Propulsion Fall 2019
        • Avionics 2018
        • Recovery 2018
        • Avionics (new intro project Fall 2021)
  • Project Management
  • History of the Team
    • Early Years
    • Executive History
    • Launch History
      • 2022-12-03 MINDI First Flight
      • 2022-09-17 Pinkbeary First Flight
      • 2019-11-16 AirBears First Flight
      • 2018-03-24 Final flight for Arktos
      • 2017-04-08 Competition Launch, NASA SL 2017
      • 2017-03-25 FRR Re-Re-Flight, NASA SL 2017
      • 2017-03-12 FRR Re-Flight, NASA SL 2017
      • 2017-03-04 FRR Flight, NASA SL 2017
      • 2016-12-04 CDR Subscale Flight, NASA SL 2017
    • Fleet
  • How to use GitBook
Powered by GitBook
On this page
  • Parachute Purchasing
  • Parachute Deployment Scheme
  • Drogue
  • Main
  • Objectives
  • Ground Hit Velocity
  • Kinetic Energy
  • Drift
Export as PDF
  1. Tutorials
  2. Recovery

Parachute Sizing

Deciding which parachutes to use: where to buy them from, how big, and other things to consider

PreviousRecoveryNextAvionics Sled

Last updated 5 years ago

Parachute Purchasing

For parachute purchasing, Recovery typically sources from FruityChutes. They also provide us with a 10% discount if you mention that you are with STAR. Their chutes have a coefficient of drag (CD) of 2.2 for large iris or 1.9 for smaller iris parachutes used for drogues which is ideal, we would not want that to significantly decrease.

Parachute Deployment Scheme

This is the order of recovery. Note the order of deployment and location.

Drogue

The purpose of the drogue parachute is to slow down the rocket such that once at terminal velocity we can safely deploy the main parachute. It is deployed at apogee. The drogue parachute should be significantly smaller than the main parachute so as not to exacerbate wind drift. With respect to mounting in the rocket, the drogue is typically attached the the lower portion of the rocket (nose cone side).

Main

The purpose of the main parachute is to significantly slow down the rocket to allow it to land safely and softly. This is to preserve the rocket and materials within it. The main parachute is deployed after the rocket with the drogue parachute has reached terminal velocity. Recently, deployment has been within a range of 700-800 feet of elevation. It should be significantly larger than the drogue parachute. With respect to mounting in the rocket, the main parachute is typically attached to the upper portion of the rocket (booster side).

Objectives

Our goal in parachute sizing is to reasonably minimize ground hit velocity, the kinetic energy at landing, and drift of the rocket.

We use Open Rocket as our main calculator for kinetic energy, drift, and ground hit velocity. You should also be sure that there is not an issue with the jerk moment, which would occur if there is too much of a difference in size between the drogue and main chutes. If there is an issue, it will be easily identified in Open Rocket.

Ground Hit Velocity

We typically try to minimize the ground hit velocity. According to IREC regulations: ground impact speed should be no more than 30 ft/s or 9 m/s.

Kinetic Energy

We typically try to minimize the kinetic energy of sections. According to our STAR regulations: maximum section Kinetic Energy should be no more than 100 Joules . This is for the purpose of safety and to ensure delicate components are not broken upon landing .

The upper section, avionics bay, and lower section should all meet this requirement.

Equations

KE=mv22KE = \frac{mv^2}{2} KE=2mv2​

where m is the mass per section, v is the terminal velocity post main chute deployment.

Drift

We typically try to minimize the wind drift. According to IREC regulations: main deployment should not exacerbate wind drift (eg 75 - 150 ft/s or 23-46 m/s). Furthermore, we have additional STAR specific regulations: drift should be within the confines of launch site, drift should be less than ⅖ of apogee.

Wind drift should be calculated for 10 mph wind = 4.47 m/s

Open Rocket will give results of expected drift based on inputs of weight of the rocket, apogee height, parachute sizes, and wind conditions. Or calculations can be made from the expected flight time.

Drift=v∗t\text{Drift} = v*tDrift=v∗t

Where v is wind speed (4.47 m/s) and t is expected flight time.

Parachute Manufacturers for Drones, Rockets, UAV, Research | Fruity Chutes!fruitychutes
Open Rocket Simulation Data
Drogue parachute too small
Logo